Tunkhannock Twp. Fire Company, Station 42, was dispatched to a dwelling fire in the Briar Woods development around 2:45 am this morning. Engine 42 arrived to a well off dwelling fire and stretched two lines. Lake Harmony was then added for our Tanker and Engine. Both trucks responded simultaneously with full crews. Once on scene the tanker was put in the tanker shuttle, where it dumped several loads of water into the porta tank set up in front of Engine 42. Engine 17’s crew went to work manning several handlines and helping with ventilation efforts. Once the bulk of the fire was knocked down, crews assisted with overhaul. District 17 units were on scene for over 3 hours.
